Deploying skilled manufacturing and construction professionals from its offices and Roeslein’s modular fabrication facility in Red Bud, Illinois gives Roeslein Alternative Energy the flexibility to assemble the right combination of resources for every project.  The same craftsmen who engineer and manufacture the modular systems follow the product to the field to perform the final installation.  This methodology allows RAE to deliver the highest-quality product on schedule and within budget.

On Site: Subcontract

  • Architectural finishes
  • Fire protection
  • Geotechnical work
  • Insulation
  • Painting
  • Paving
  • Plumbing
  • Pre-Engineered buildings
  • Site work
  • Steel Erection

On Site: Self Perform

  • Electrical
  • Machinery foundations
  • Millwrighting
  • Process piping
  • Rigging